This installation is for clicker press model GRA series.
In this case,It’s necessary to carefully fill in hydraulic oil from special notch at side of oil cylinder according to the following procedures:
1.Fill in hydraulic oil until reaching the position nearby the bottom of threaded hole under notch if maximum level.
2.Connect power supply and observe if pump rotates correctly according to the abovementioned procedures.Rotate adjustable disc of rocker counterclockwise until rocker stops and then swing arm can rise to maximum stroke in this way.
3.Put a wood block with a height aprroximate to 2cm or other hard materials between cutting table and swing arm.,then start machine(it is required to press with both hands)by pressing appropriate key for several minutes.This procedure aims to remove air from relevant pipelines of oil cylinder.
4.Remove previously used spacer,make there is nothing on cutting table,slowly rotate adjustment disc clockwise until swing arm goes down to a position that is about 1cm away from the table surface.Then,check the oil amount in oil cylinder and refill hydraulic oil when necessary until reaching the position nearby the bottom of threaded hole under notch of maximum level.Only in this way can accurate oil amount be ensured in oil cylinder.
5.If you still have problem to installation for die cutting machine and any models clicker press,you could contact us or your retailer.